Project Team
  • Construction Manager: Mace
  • Civil / Structural Engineer: Mace
  • Main Contractor: Blu-3
  • Works Contractor: Rossmore Civils
Client
  • Meta
Contractor

Rossmore Civils

Duration
June 2022 – March 2022

Project Description

  • Bulk excavation and disposal 12,000m3
  • Drainage and ducting to Guardhouse area including high specification sealed concrete chambers
  • 2,500m2 of finished asphalt roadway, line marking and road signage. Road finishes include coloured cycle track.
  • Mixture of concrete paths and specialist paved finishes and granite precast kerbs.
  • Installation of monument plinth.
  • Specialist watermain installation inclusive of double check valves, flow limiting valves, washout valve, hydrants, etc.
  • Installation of 400m of Type 1 retaining wall to perimeter of guardhouse (3m3 of concrete per linear metre of wall)
  • Foundations and internal drainage and services and insulated slabs for guardhouse
  • Campus perimeter patrol road including pencil kerb edging for 3km