Dublin Airport – Airside Pollution Control Works
Client
- Dublin Airport Authorities
Main Contractor
Balfour Beatty
Duration
August 2011 – November 2011
Works Completed include:
- Excavate, lay and backfill 1,457m of 1200mm dia precast concrete pipe.
- Construct reinforced concrete cast insitu manholes: 13 nr
- Install interceptors: 5 nr
- Open cut crossing of existing runway and taxiway: 85m
- Crossing of live runway by pipejacking method: 65m
- Demolition of redundant office space: 2,800 sq. feet