Project Name
N7/N11 Arklow to Rathnew PPP road Project
Client
  • National Roads Authority
Main Contractor

Bam Civils

Duration
August 2013 – August 2015
  • Rossmore have carried out the earthworks and drainage upgrade works on the existing live N11 road in advance of the main road realignment and tie-in works.
  • On the mainline motorway project Rossmore have carried out drainage works on over 12,000m of carriageway.
  • Installation of culverted watercourses across the proposed road alignment.
  • Complete mainline drainage upon removal of earthworks plugs at structure.
  • Reinstatement of existing tip facilities at various locations along mainline.
  • Excavation and laying of herringbone drainage in mainline and sliproad batter.
  • Bulk excavation and placing of capping at new structure locations.
  • Ducting at various locations along mainline.
  • Excavation of storm water retention ponds.
  • Installation of storm-water attenuation tanks.
  • Main line ducting.
  • Top soiling of embankments.