Project Team
  • Civil / Structural Engineer: DAA

  • Construction Managers: DAA

  • Main Contractor: SLJV

Client
  • Dublin Airport Authority

Contractor

SLJV

Duration
May 2022 – May 2023
  • Installation of 6.5m High Jet Blast Fencing to protect workers from Jet Blast during Aircraft manoeuvring.
  • Demolition and Removal of existing life expired taxiway including subbase to a depth of up to 3.0m.
  • Demolition and Removal of all existing Drainage, Electrical and Comms pipework.
  • Excavation and Disposal from site of 35,000m3 of Unsuitable Material
  • Construction of the Drainage and ducting infrastructure including 1,500m of Surface Water Pipework, 300m of In-situ Gatic Slot Drain, 500m of Precast Slot Drain, 76no. In-situ Concrete Manhole up to 2.1m and 5m deep, 60no. Precast Access/Outlet Boxes, Geo-cellular Stormwater Retention Tank. (112m long x 7m wide x 3m deep.
  • 13,000m of 150mm Ducting
  • 140no. Precast Chambers up to 1.5m2
  • Construction of 10,000m2 of new Concrete Taxiway.
  • Construction of 3,000m2 of Flexible Pavement Taxiway joining to Main Runway during 3 week – 24 hour shutdown period
  • Reprofiling and Topsoiling entire works area