Project Team
  • Client: Takeda

  • Civil / Structural Engineer: DPS/Arcadis

  • Quantity Surveyor: DPS/Arcadis

  • Main Contractor: Rossmore Civils

Client
  • Takeda

Contractor

Rossmore Civils

Duration
February 2023 – March 2024
  • Set up project compound including supply of accommodation & welfare facilities
  • Installation of drainage, ducting, fire main & gas main
  • Construction of utility building consisting of the following:
    • Insulated structural slab & foundations
    • Structural steel building frame
    • Cladding & Roofing
    • Roller Shutter Door & Personnel Door
    • Internal Fire Shaft Walls & Partitions & Fire Door
    • Skimming, Painting Walls & Sealing Floor
  • Construction of external Thermal Oxidiser slab, bunds & pipe rack bases – total 225m3 concrete
  • Design of reinforcing steel for concrete structures
  • Palisade fencing and gates to Thermal Oxidiser slab
  • Epoxy sealing of external concrete surfaces & bund testing for water tightness
  • Construction of permeable asphalt roadways, line marking and signage
  • Final landscaping inclusive of seeding, tree & hedge planting
  • Demobilisation of temporary compounds, car parks & walkways
  • Partnering with stakeholders on design development, logistics planning and programme