Client: Takeda
-
Civil / Structural Engineer: DPS/Arcadis
-
Quantity Surveyor: DPS/Arcadis
-
Main Contractor: Rossmore Civils
Client
-
Takeda
Contractor
Rossmore Civils
Duration
February 2023 – March 2024
- Set up project compound including supply of accommodation & welfare facilities
- Installation of drainage, ducting, fire main & gas main
- Construction of utility building consisting of the following:
- Insulated structural slab & foundations
- Structural steel building frame
- Cladding & Roofing
- Roller Shutter Door & Personnel Door
- Internal Fire Shaft Walls & Partitions & Fire Door
- Skimming, Painting Walls & Sealing Floor
- Construction of external Thermal Oxidiser slab, bunds & pipe rack bases – total 225m3 concrete
- Design of reinforcing steel for concrete structures
- Palisade fencing and gates to Thermal Oxidiser slab
- Epoxy sealing of external concrete surfaces & bund testing for water tightness
- Construction of permeable asphalt roadways, line marking and signage
- Final landscaping inclusive of seeding, tree & hedge planting
- Demobilisation of temporary compounds, car parks & walkways
- Partnering with stakeholders on design development, logistics planning and programme