Grifols Phase 2
Client
- Grifols
Main Contractor
Stewarts
Duration
November 2016 – August 2018
Works Completed include:
- Site Clearance and Topsoil Strip 21,000m2
- Excavation and blinding of pads
- Bulk filling of building footprint, car parks and logistics yard.
- Bulk Excavation and off site of Existing stock piles on site 41,000m3
- Excavation and Formation of Attenuation pond 2,000m3
- Installation of Foul and Storm Drainage
- Installation of all water main and connection to existing
- Installation of MV LV and communications ducting
- Bulk excavation of and construction of radius underground RC tank and backfill
- All Paving, Kerbing and Finishes 2,500m2