Civils Site Development Project
Client
- SYSCO / Pallas Foods
Main Contractor
John Paul / Balfour Beatty JV
Duration
September 2013 – February 2015
Works Completed include:
- The full Site Enabling Works required comprising 120,000m3 of bulk excavation cut to fill on site.
- Soil stabilization of 48,000m3 was required to be stabilised with both Lime and Cement treatment.
- Installation of foundations for 28,000m2 of building,
- Due to the presence of pyritic rock on site, the designers requirements were implemented for the treatment of pyrite under building formations, trenches and pavements.
- Installation of an extensive network of services and drainage 1.0-5.0m deep.