Project Name
Civils Site Development Project
Client
  • SYSCO / Pallas Foods
Main Contractor

John Paul / Balfour Beatty JV

Duration
September 2013 – February 2015

Works Completed include:

  • The full Site Enabling Works required comprising 120,000m3 of bulk excavation cut to fill on site.
  • Soil stabilization of 48,000m3 was required to be stabilised with both Lime and Cement treatment.
  • Installation of foundations for 28,000m2 of building,
  • Due to the presence of pyritic rock on site, the designers requirements were implemented for the treatment of pyrite under building formations, trenches and pavements.
  • Installation of an extensive network of services and drainage 1.0-5.0m deep.
  • Construction of associated access roads and car parking.