Dublin Airport Central One
Client
- Dublin Airport Authorities
Main Contractor
Stewarts
Duration
March 2018 – June 2020
Works Completed include:
- Excavation of Pile Caps and Under Slab Drainage and Services.
- Construction of 250m airport road incl. drainage and services.
- Installation of Storm and foul drainage, comms, MV, LV, and Gas underground services.
- Crushing of 6,000ton of demolition material processed for reuse.
- Grubbing up of ground floor slab and foundations of existing buildings and completion of Temp Road Diversions.
- Installation and removal of temp sheet piling to allow for the installation of Crane Base.
- Construction of Public realm Landscaped area.
- Bulk Excavation and Disposal offsite 19,000m3
- Hard Landscaping Package including;
- Installation of solid Granite Benches incl construction of RC bases for benches.
- Installation of Granite Kerbing 1,500 lm
- RC Retaining walls, access stairs and Parapet walls,
- Bicycle Shelters 3 No. All Street furniture installation.
- Paving 5,000m2,
- Installation of Drainage Channels 1,100 lm,
- Street lighting and street lighting ducting.
- Placing topsoil and landscaping to green areas.