Client
- Merck Sharp & Dohme
Contractor
PJ Hegarty & Sons
Duration
Works include the site clearance, topsoil strip, bulk excavation, filling and disposal of surplus material.
•Topsoil: 55,000m3
•Bulk Dig: 88,000m3
•Imported Stone: 46,000m3
•General Filling & Soil Stabilisation: 35,000m3
Excavation of foundations, breaking down piles and placing of hardcore fill to proposed formation levels.
•Piles: 929 no.
•Foundations: 1,973m3
Installation of underground services.
•Firemain/Process Main/Foul/Surface: 2,100m
Finish all surrounding roads, yards etc. to proposed finished levels.
•18,000m2