Client: DAA

Main Contractor: Balfour Beatty Ireland

Duration : 2012

Project Description:

Upgrade of 1,600 sq.m of aircraft taxi-way concrete pavement including:

  • Dismount, set-aside and reinstate existing taxi-way lighting.
  • Excavation & off-site disposal of existing pavement layers.
  • Form new pavement comprising 150mm granular sub-base layer on geotextile with 375mm PQ concrete reinforced with A393 mesh including dowelled joints to existing pavement.
  • Reinstatement of taxi-way delineation including thermoplastic linings.