Redhill Landfill

Biogenie Redhill

Rossmore

Rossmore Civils

Redhill

Vegetation site clearance = 50,000m2

 

Excavation of silts below water level = 12,000m3

 

Cut/Fill to design levels to form Cell= 390,000m3

 

Install Band drains to direct water to new high rise pumping system = 520m

 

Install Chimney drains to control water ingress through cell batter = 110m

 

Place engineered clay to Cell = 36,000m

 

Trim rubbish and place trummel fines to regulate for liner installation 44,000m2

 

Install liner 44,000m2

 

Place one meter of clay to cap off tip = 44,000m3

You must be logged in to post a comment.